A Joint Venture with AWS: Building Korea’s AI Backbone
SK Group Chairman Chey Tae‑won toured the SK AI Data Center Ulsan, a facility under construction in the city’s national industrial complex, accompanied by the chief executives of SK Innovation, SK Telecom and SK Gas. The center is being developed jointly with Amazon Web Services (AWS) at an estimated cost of 7 trillion won (about US$5.2 billion). Chey described the project as a key piece of South Korea’s AI infrastructure, emphasizing its role in supporting high‑performance computing powered by graphics processing units (GPUs) and its use of hybrid cooling systems for greater efficiency than conventional data centers.
Why the Ulsan AI Data Center Matters
- Estimated investment: 7 trillion won (~US$5.2 billion)
- Joint development with AWS to leverage cloud expertise
- Focus on GPU‑based high‑performance computing for AI workloads
- Hybrid cooling technology to improve energy efficiency and performance
Bridging AI and Manufacturing at the Ulsan Complex
During the visit, Chey pointed to SK Innovation’s Ulsan Complex (CLX) – the group’s flagship refining and petrochemical production base – as a major testing ground for applying AI to real‑world manufacturing operations. He stressed that SK’s ambition to become a full‑stack AI provider can only be realized when the AI data center and the Ulsan CLX are seamlessly linked, allowing AI developed in the data center to be deployed directly on the factory floor. The Ulsan CLX’s ongoing AI‑driven transformation thus serves as a concrete example of how the group’s expanding computing infrastructure can enhance its traditional manufacturing businesses.
Strategic Benefits of the AI‑Manufacturing Link
- Accelerates AI adoption across refining and petrochemical processes
- Creates a feedback loop: factory data improves AI models, AI optimizes plant operations
- Positions SK Group as an end‑to‑end AI solutions provider
- Demonstrates a scalable model for other industrial sites in Korea
Timeline, Technology, and Economic Impact
Construction of the Ulsan data center began with a groundbreaking ceremony in August 2025, and the facility is slated to start operations in the second half of 2027. Designed for GPU‑based high‑performance computing, the center incorporates hybrid cooling to boost performance and energy efficiency. SK Group intends to use the site as a hub to attract AI companies, create jobs and drive manufacturing innovation, positioning it as a new growth engine for the industrial city of Ulsan.
Project Milestones
- August 2025: Groundbreaking ceremony
- H2 2027: Expected commencement of operations
- Ongoing: Hybrid cooling system installation and GPU infrastructure build‑out
Anticipated Economic Impact
- Creation of high‑skill jobs in AI, data center operations, and advanced manufacturing
- Attraction of domestic and international AI firms to the Ulsan industrial complex
- Stimulation of local supply chains and service providers
- Enhanced competitiveness of Ulsan as a hub for AI‑powered industrial development
Takeaway: Chairman Chey’s visit underscores SK Group’s strategy to fuse cutting‑edge AI infrastructure with its established manufacturing base, aiming to turn Ulsan into a model for AI‑powered industrial development in South Korea.